Compare points on the full feasible edge y = 10 − x, where 0 ≤ x ≤ 10. The objective is Z = 4x + y. At x = 0, objective Z = 10. For each unit increase in x, the change in objective Z is 3. Predict objective Z at x = 6.
Worked solution
- Choose the ruleZ = 4x + (10 − x) = 10 + 3x
- Why it appliesSubstituting the binding edge constraint turns the objective into a linear function of x. Its slope indicates the improving endpoint.
- Work it outStart from the intercept and add the accumulated change: 10 + (3) × 6.
- Resultobjective Z is 28.